The Concrete Leveling Process

Ever wonder how does concrete lifting work?

Step 1:

Identify problem areas that lack the necessary fill to keep your concrete level.

Step 2:

Once we have accurately identified the problem areas, we drill tiny holes, usually the size of a penny through the affected concrete.

Step 3:

After drilling the holes in the concrete, we use a hardening mixture that consists of polyurethane foam. This mixture is slowly injected into the holes we drilled, using a concrete leveling machine.

Step 4:

As the foam mixture is injected, the void below the concrete slabs is filled, and your slabs will begin to rise, thus leveling them.

Step 5:

Once all the holes have been filled, we fill and cap the holes with concrete so that they are hardly noticeable.